The job was started. Then the calls stopped getting returned. Maybe the unit runs but not right, maybe there is a hole in the ceiling tile and a part on order that never arrived, maybe there is just an invoice and silence.
Whatever comes next, the next crew will ask the same first question: what was actually done, and what was promised? The answer lives in a handful of documents and photos. Gather them now, while the details are fresh and before anyone else touches the work.
This page is about collecting and writing down. It is not legal advice and it does not interpret your contract or your lease.
If anything is unsafe, deal with that first
If there is exposed wiring, a panel cover left off, water coming through, or a smell of gas, that comes before any paperwork. Keep people away from it. If anyone smells gas, get everyone out. From a safe distance, call 911 and your gas utility, as Atmos Energy's gas leak guidance advises.
The quote, and anything that changed it
Find the original quote or estimate, in whatever form it came: an email, a PDF, a text message, a page on a clipboard.
- What was quoted. The scope as it was written, not as it was described on the phone.
- Any changes. If the scope or the price changed along the way, find where that was agreed. An email or a text counts. A conversation nobody wrote down does not, so write down what you remember of it now and label it as your notes.
- The contract or work order, if there was one, and who signed it.
Every invoice and every payment
- Invoices, including any that came in after the calls stopped.
- What you paid, when, and how. Check numbers, card statements or bank records.
- Deposits. If a deposit was paid for parts or equipment, note what it was for and whether that equipment ever showed up.
Line the invoices up against the quote. Where an invoice has no matching line in the quote, flag it. Where a quoted item has no invoice, flag that too. Those gaps are the first thing the next crew needs to see.
Photos of where things stand today
Photograph the work as it is right now, before anyone else touches it.
- The work area, wide enough to show where it is in the building.
- Anything unfinished. Open ceiling tiles, loose wiring, capped pipes, parts left on site.
- Equipment labels. On anything the vendor installed or replaced, a clear photo of the label with the make, model and serial number.
- Anything left behind. Boxes, packaging, old parts, tools.
Note the date you took them. If you have photos from before the job started, put them in the same folder.
Permits and inspections
Some work needs a permit from the city, and a permit stays open until the work passes inspection.
- Was a permit pulled? Look for a permit posted at the site or mentioned in the quote or invoices.
- If so, find its number and whether the final inspection happened.
- If you are not sure, write that down. The next crew can check with the city that issued it.
An open permit is worth knowing about before new work starts on top of old work, so do not skip this one because it is hard to find.
Equipment and warranty paperwork
- Model and serial numbers for anything installed, from the label photos above.
- Any warranty paperwork the vendor handed over, or the manufacturer's registration if they did it for you.
- Manuals or start-up sheets left on site.
Who has access
Write down which keys, door codes, gate codes or roof access the vendor was given. You may want to change some of them, and the next crew will need to know how to get to the equipment.
Your own notes
While you still remember, write a short timeline: when the vendor was hired, when work started, the last time anyone was on site, and the last time anyone answered. Keep copies of the calls, texts and emails that went unanswered. Keep it factual. It is a record, not a complaint.
If the work involves equipment your lease asks you to maintain, put a copy of all of this in your maintenance file. What a usable service record looks like covers what that file needs to show.
What not to do
- Do not finish the work yourself, and do not have someone in the office try.
- Do not throw away anything the vendor left behind until the next crew has seen it.
- Do not reset a breaker that keeps tripping, or turn back on anything the vendor shut off, without knowing why it was off.
When you are ready to hand it over
If a vendor left you mid-job, that page explains how we take over: we inspect what is actually installed, not what the last paperwork says, and we tell you what it will take before we start. Bring the folder.
For the wider set of operating questions a triple-net lease hands you, read the triple-net tenant guide.
Your lease is the final word on what it requires and who arranges it. This page describes the usual pattern and does not interpret your document.
Any work beyond the original quote gets approved by you, in writing, before we start.